“I think we have seating for about 350 on the first floor. The pillars in the lounge area have large monitors that will display general information. The first floor contains a variety of different seating options to accommodate any kind of function, from groups playing cards to independent study time.įurniture in the lounge area, picked out by students in Student Services, include bean bags with charging ports, diner-like booths and sofas. Wide shot of the first floor with a variety of different seating arrangements with dust covers on. “On the first floor, we have what we call ‘sit-and-relax’ area where kids can hang out,” Mining said. The Student Center has three floors, which are separated between different functions, and six disability-accessible elevators. “There are quite a variety of spaces that are available to be used and it’s intended to be used for students to hang out, to have fun, to collaborate, to enjoy the other parts of college and learning that aren’t just from a book,” Minning said. SAC, wants students to experience a fun college life with the new Student Center. SAC.Ĭarol Minning, project manager of construction at Mt. Map view of the Student Center under construction. The Student Center sits south of the Equity Center and west of Building 26. The facility will offer students, staff and the general public a variety of new features and services including a large convenience store, reservable meeting rooms and a spacious event hub. SAC’s long-awaited Student Center will host a grand opening ceremony on June 28 after years of development and construction.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |